Hornhill Road closures |
Post Reply | Page 123> |
Author | |
Piglet
Villager Joined: 22 September 2010 Location: United Kingdom Status: Offline Points: 184 |
Post Options
Thanks(0)
Posted: 04 January 2019 at 7:15pm |
I've seen the signs on my way to work saying that Hornhill Road will be closed from 7th to 18th January 2019. Usually these road closures tend to start after the rush hour, but the signs don't say anything about the times of closure......does anyone have any inside info or know how to find out?
|
|
Sponsored Links | |
MV Owner
Chalfontonian Joined: 09 January 2011 Location: Over the George Status: Offline Points: 1029 |
Post Options
Thanks(0)
|
apparently the road closure is due to HS2, thats all I know
|
|
AndyM
Sandbox Joined: 05 January 2019 Status: Offline Points: 1 |
Post Options
Thanks(0)
|
The road is completely closed from the 7th to the 18th of January. No access at all during those dates.
A member on the CSP Facebook group scanned the leaflet and I've uploaded it here Hope this helps
|
|
MV Owner
Chalfontonian Joined: 09 January 2011 Location: Over the George Status: Offline Points: 1029 |
Post Options
Thanks(0)
|
Thanks Andy, appreciated and welcome to the forum If they do what the leaflet says then they will be welcomed changes to the road
|
|
Paul_G
Chalfontonian Joined: 11 January 2005 Location: Vanuatu Status: Offline Points: 621 |
Post Options
Thanks(0)
|
Tried to get back from Maple Cross to CSP with hot fish and chips last night along Hornhill Rd. Closed above all the speed bumps. NO OBVIOUS NOTIFICATION lower down into Maple Cross. Had to backtrack and detour via Newlands. Result: Warm fish and chips. Thanks, HS Poo. |
|
Piglet
Villager Joined: 22 September 2010 Location: United Kingdom Status: Offline Points: 184 |
Post Options
Thanks(0)
|
I share your frustration Paul G - the leaflet kindly posted on the forum says closures are between 7 a.m and 6 p.m. I went that way at 6:45 p.m last night and no way of getting through. Surely it's not difficult to get stuff like that right and put in proper processes? Actually, second thoughts, it clearly is!!
|
|
MrsG
Newcomer Joined: 25 April 2017 Location: CSP Status: Offline Points: 10 |
Post Options
Thanks(0)
|
It does say on leaflet that after the hours of work plus one hour either side for setting up and packing away that the road will remain closed for safety reasons .
|
|
allotmentman
Newcomer Joined: 22 February 2017 Location: CSP Status: Offline Points: 12 |
Post Options
Thanks(0)
|
Does anyone know if it has been re-opened yet.
|
|
Piglet
Villager Joined: 22 September 2010 Location: United Kingdom Status: Offline Points: 184 |
Post Options
Thanks(0)
|
I don't know - probably not because the flyer says until 18th Jan. I'm fully expecting it to be open tomorrow when I want to go that way! It's been such a pain with it closed, my journey to and from work has been horrible!
|
|
MV Owner
Chalfontonian Joined: 09 January 2011 Location: Over the George Status: Offline Points: 1029 |
Post Options
Thanks(0)
|
I have just spoke to one of the workmen assigned to blocking the road. He thinks it will be open from 10pm tonight
|
|
Post Reply | Page 123> |
Tweet |
Forum Jump | Forum Permissions You cannot post new topics in this forum You cannot reply to topics in this forum You cannot delete your posts in this forum You cannot edit your posts in this forum You cannot create polls in this forum You cannot vote in polls in this forum |