What a colossal waste of money
|
|
Sponsored Links | |
Nikblik
Newcomer Joined: 25 May 2017 Location: CSP Status: Offline Points: 35 |
Post Options
Thanks(0)
|
I've scanned through the document. I recognise we have only just moved here so it could be argued we dont really have a stake to complain. And I'm not complaining, that would be like moving to near Heathrow then complaining about the noise of planes! But I am not an engineer so keen to understand what it means in practice for CSP please? For example will the roads across to Rickmansworth be closed? How much will a tunnel construction affect CSP residents on that side? Will it be noisy? How will lorries get access? When does it start and how long for? Is it 100% going ahead? Where else is affected locally? It really seems like a huge vanity project at £400 milion a mile which is staggering, if correct!
|
|
LilyRose
Local Joined: 23 November 2015 Location: CSP Status: Offline Points: 48 |
Post Options
Thanks(1)
|
I'm afraid I don't know too much either. I do know that Chalfont Road (near the motorway) will be closing in the next few months. So the only access to Rickmansworth will be Rickmansworth Lane or Chalfont Lane (confusingly similar name but this is the one that has Newland Park on it and goes into CSG). Roberts Lane will be closed to through traffic to stop it being used as a rat run. A new road is being built alongside the M25. I believe earth extracted will go on to lorries and straight onto m25 but I'm not sure. There is a HUGE depot being built at the end of Tilehouse Lane. I think the traffic will be awful on the North Orbital road. The building of a vent on Denham Lane will be very disruptive for local residents and people using that road too. Pretty awful all round but I guess it depends on where you live in CSP as to how much it will affect you. As for noise pollution - who knows! This will go on for about a decade.
|
|
MV Owner
Chalfontonian Joined: 09 January 2011 Location: Over the George Status: Offline Points: 1029 |
Post Options
Thanks(0)
|
Lilly, What is going to be the impact on Joiners Lane and Denham Lane do we know?
I get the impression from looking at everything on Google maps that most of the access into the area will be in the North Orbital Road / end of West Hyde Lane area. I cant see why Chalfont St Peter will be used for access really Edited by MV Owner - 19 July 2017 at 9:20am |
|
LilyRose
Local Joined: 23 November 2015 Location: CSP Status: Offline Points: 48 |
Post Options
Thanks(0)
|
The only info I have found is through doing lots of googling. I have seen some traffic predictions on roads around CSP but I can't remember where. I will take another look.
|
|
MV Owner
Chalfontonian Joined: 09 January 2011 Location: Over the George Status: Offline Points: 1029 |
Post Options
Thanks(0)
|
Cheers. I dont want to sound selfish but I am trying to establish the affects on the Roads in CSP. Of course none of us want a building site on their doorstep, Im actually trying to find out how CSP will actually be affected.
|
|
Sunray
Villager Joined: 04 November 2006 Status: Offline Points: 428 |
Post Options
Thanks(1)
|
I understand that lorries with spoil, and deliveries for the construction of the shaft to be built along Denham Lane near Ashwell Farm will come along Denham Lane and down Joiners Lane to the roundabout.
|
|