Is the bridge being closed again in the village? If so is it going to be completed this time?
|
|
local born and bred
|
|
Sponsored Links | |
Sunray
Villager Joined: 04 November 2006 Status: Offline Points: 428 |
Post Options
Thanks(0)
|
I should think this is to strip out the temporary supports and formwork from under the bridge, and to remove the mesh screens that were put in the river to protect the temporary supports. They have to wait 6 weeks for the concrete to achieve its maximum strength before they can do this.
|
|