Forum Home Forum Home > Chalfont St Peter > News and Gossip
  New Posts New Posts RSS Feed - HS2 Footpath Closures
  FAQ FAQ  Forum Search   Events   Register Register  Login Login


HS2 Footpath Closures

 Post Reply Post Reply Page  12>
Author
Message Reverse Sort Order
paul_t View Drop Down
Sandbox
Sandbox


Joined: 17 December 2018
Location: CSP/CSG
Status: Offline
Points: 1
Post Options Post Options   Thanks (0) Thanks(0)   Quote paul_t Quote  Post ReplyReply Direct Link To This Post Topic: HS2 Footpath Closures
    Posted: 17 December 2018 at 9:21am
I have been asking them about this for a while.

The last thing I got (by email) was a clear indication that the FPs near the CSP vent shaft will remain open, one of them being slightly diverted.  As to when this will happen is unclear, even to the PR people who are sent to liaise with us at these community events.
Back to Top
Sponsored Links


Back to Top
big baggles View Drop Down
Chalfont Snapper
Chalfont Snapper
Avatar

Joined: 11 January 2005
Status: Offline
Points: 7320
Post Options Post Options   Thanks (0) Thanks(0)   Quote big baggles Quote  Post ReplyReply Direct Link To This Post Posted: 15 December 2018 at 12:06am
i know there was talk of trying to improve the childrens play area/ skate park equipment......looks like others have successfully gained funds....
need a stella and i need one now !
Back to Top
watsy View Drop Down
Chalfont Admin
Chalfont Admin
Avatar

Joined: 11 January 2005
Status: Offline
Points: 1426
Post Options Post Options   Thanks (0) Thanks(0)   Quote watsy Quote  Post ReplyReply Direct Link To This Post Posted: 13 December 2018 at 4:28pm
I didn't, I was not around unfortunately.

Has anyone's business in Chalfont St Peter benefited from this:

Back to Top
big baggles View Drop Down
Chalfont Snapper
Chalfont Snapper
Avatar

Joined: 11 January 2005
Status: Offline
Points: 7320
Post Options Post Options   Thanks (0) Thanks(0)   Quote big baggles Quote  Post ReplyReply Direct Link To This Post Posted: 07 December 2018 at 12:29pm
did anyone go ? 

need a stella and i need one now !
Back to Top
watsy View Drop Down
Chalfont Admin
Chalfont Admin
Avatar

Joined: 11 January 2005
Status: Offline
Points: 1426
Post Options Post Options   Thanks (0) Thanks(0)   Quote watsy Quote  Post ReplyReply Direct Link To This Post Posted: 23 November 2018 at 1:18pm
If you want to find out more about HS2 - they are having another local event on 6th December - 4-8pm at the Parish Hall.

The considerable works on Chesham Lane has now completely disappeared - cannot surely have just been for the Newts...

HS2 Invite Dec 2018
Back to Top
big baggles View Drop Down
Chalfont Snapper
Chalfont Snapper
Avatar

Joined: 11 January 2005
Status: Offline
Points: 7320
Post Options Post Options   Thanks (0) Thanks(0)   Quote big baggles Quote  Post ReplyReply Direct Link To This Post Posted: 27 April 2018 at 4:44pm
sad to say i have to agree, the numbers, sums and statistics for Hs2 just seem to be numbers plucked out of thin air, - i remember being in a presentation about the soil and spoil from excavations in the chilterns going london bound by rail to be  deposited in and around the brakespear road area of harefield/ ickenham, raising ground level by meters....

is this still happening ?
need a stella and i need one now !
Back to Top
Paul_G View Drop Down
Chalfontonian
Chalfontonian


Joined: 11 January 2005
Location: Vanuatu
Status: Offline
Points: 621
Post Options Post Options   Thanks (0) Thanks(0)   Quote Paul_G Quote  Post ReplyReply Direct Link To This Post Posted: 25 April 2018 at 12:35pm
Doesn't the ecology and habitat pdf rather miss the point?  A few HGV movements, some mud on road that will be cleaned up, work to finish by end of May 2018. All very sweet and good for nature blah blah. Who would get very upset about that?

But isn't this where the intervention shaft is going? HS Poo is 60m underground here so they'll have to excavate to 70m minimum. And a 15m x 15m minimum cross-section? (just guessing). That's getting on for 16,000 cubic metres of soil and rock to get rid of. Plus all the construction equipment and materials going to site.  Rather more than 'a few HGV movements' I think.  And completion by end of May 2018? I think not.
Back to Top
big baggles View Drop Down
Chalfont Snapper
Chalfont Snapper
Avatar

Joined: 11 January 2005
Status: Offline
Points: 7320
Post Options Post Options   Thanks (0) Thanks(0)   Quote big baggles Quote  Post ReplyReply Direct Link To This Post Posted: 17 April 2018 at 3:46pm
me neither, was away from csp last night....
need a stella and i need one now !
Back to Top
watsy View Drop Down
Chalfont Admin
Chalfont Admin
Avatar

Joined: 11 January 2005
Status: Offline
Points: 1426
Post Options Post Options   Thanks (0) Thanks(0)   Quote watsy Quote  Post ReplyReply Direct Link To This Post Posted: 17 April 2018 at 8:25am
Couldn't make it last night unfortunately, anyone have any info or links.
Back to Top
big baggles View Drop Down
Chalfont Snapper
Chalfont Snapper
Avatar

Joined: 11 January 2005
Status: Offline
Points: 7320
Post Options Post Options   Thanks (0) Thanks(0)   Quote big baggles Quote  Post ReplyReply Direct Link To This Post Posted: 16 April 2018 at 3:21pm
meeting at the parish council offices ( i think tonight ) about hs2 and the works in the locality
need a stella and i need one now !
Back to Top
 Post Reply Post Reply Page  12>

Forum Jump Forum Permissions View Drop Down

Forum Software by Web Wiz Forums® version 12.06
Copyright ©2001-2023 Web Wiz Ltd.